> 英语 >
英语翻译
Accurate error estimates can be calculated with at least 4 GCPs,while often at least 5 are needed to cover the center of the project as well,which reduces the chance of error propagation and resulting terrain distortions especially on flat or undulating terrain types.
人气:422 ℃ 时间:2020-04-20 05:35:00
解答
用至少4个地面控制点可以计算出准确的误差估计,而通常至少需要5个地面控制点以同时覆盖项目的中心区域,这样可减少误差传播从而导致地形失真的几率,尤其是在平坦或起伏的地形类型上.
推荐
猜你喜欢
© 2026 79432.Com All Rights Reserved.
电脑版|手机版