英语翻译
1、安装光分配架
2、光(电)缆施工测量
3、布放槽道光缆
4、市话光缆接续(光缆成端接头)
5、市话光缆中继段测试(12芯以下,调增80%)
6、光缆余长保护(含电缆上盘)
7、安装固定光缆盘
人气:226 ℃ 时间:2020-04-11 11:40:45
解答
1 Installation of light-distribution
2 Optical cables Construction Survey
3 Laying fiber optic cable channel
4 Urban Cable continued (10% fiber optic cable-connector)
5 Local cable relay of the test (12 core following,increases 80%)
6 Ms long fiber optic cable protection (including on the cable trays)
7 Installation of fiber optic cable was fixed