Prior to any section of as-trenched or as-backfilled being ROV surveyed,and at intervals of no greater than two hours,the pipe tracker shall be compensated away from the influence of the pipeline,for MANUFACTURERS quoted "field strengths" of given pipeline diameters.All such compensation checks shall be recorded on video tape and shall form an integral part of the ROV dive.
人气:253 ℃ 时间:2020-06-20 05:20:32
解答
优先进行开沟槽或回填截面的远程监测,保证中断间隔不能超过两个小时.考虑到管线的影响,应该对管件跟踪装置进行补偿(参考制造商给出的制定管径下的“磁场强度”部分)