英语翻译
The quantities given in the Bill of Quantities are estimated and provisional,and are given to provide a common basis for bidding.The basis of payment will be the actual quantities of work ordered and carried out,as measured by the Contractor and verified by the Engineer and valued at the rates and prices bid in the priced Bill of Quantities,where applicable,and otherwise at such rates and prices as the Engineer may fix within the terms of the Contract.The rates and prices of major materials (steel pipes,electromagnetic meters and valves) will be paid upon delivered to the site according to the related items in the Technical Specifications.
===================
不好意思.就是以上几句了,快回答,过时不候!
人气:276 ℃ 时间:2020-01-29 15:24:51
解答
工程量清单中列出的工程只是估计的、临时的数量.之所以给出这些信息是为了给投标一个共同的基础.支付的基础则是实际安排的和完成的工作.由承包人来计算、工程师进行核实,并且在可以的时候按照工程量清单中的费用和价...
推荐
猜你喜欢
- 根据下列数的规律 -1 -3 1 -1 3 1,__最后一个数是
- m平方-n平方-6m-4n+5因式分解
- 阅读理解 Congratulations,Mr Jones,it is a girl.
- 470-X=2(190+X)怎么解
- 将一个高3分米的圆柱体的底面分成若干相等的扇形,然后沿半径将这个圆柱体切开并重新拼成一个近似长方体.
- 三个数的平均数是8.6,其中第一数是9.1,第二个数比第三个数小0.1,第三个数是多少?
- 某校女生占全校学生数的52%,比男生多80人,这个学校有多少人
- 舅舅比张强大19岁,正好是张强年龄的3倍多1岁.舅舅和张强各是几岁