1 check whether there is nails and container handling and rough surface.
2 corrugated installation.
3.Installing steel door.
PVC pipe will into what you need.
PVC tube placed in the slots and fixed tape.
4.Install plastic
Plastic with fixed in steel with pierced
5 will be placed in the container bag out of the central position.The floor
6 connecting pipe.