英语翻译
Delete the newly applied load on the modified beam,and use the the pin support tool to put the right support back again.Now replace the left fixed support with a pin support tool.
人气:256 ℃ 时间:2020-05-30 22:18:30
解答
因为我是学桥梁的,所以帮你翻译了.对调整后的梁体进行新增荷载卸压,用千斤顶将右支座顶到原位.现在用千斤顶重新安放左边的固定端支座.
推荐
猜你喜欢