英语翻译
1.合同签订后,甲方向乙方支付合同总价的30%作为定金,结算时定金抵作合同款;
2.产品全部抵达甲方指定交货地点,甲方向乙方支付合同总价的40%后,乙方派工程队到现场安装.
3.安装完毕,双方验收合格,甲方向乙方支付剩余货款,即合同总价的30%.
人气:379 ℃ 时间:2020-03-23 02:44:58
解答
1.After the signing of the contract, Party A to Party B to pay 30% of the total contract price as a down payment, settlement arrived at to make a deposit contract; 2. Products Party arrived in the designated place of delivery, Party A to Party B to pay 40% of the total contract price, the B team to send to the site installation works. 3. Installed, the two sides qualified acceptance, Party A to Party B to pay the remainder of the purchase price, that is, 30% of the total contract price.
推荐
猜你喜欢
- 1²+2²/1*2+2²+3²/2*3+……+2000²+2001²/2000*2001
- 一个长方体的模型,所有棱长的和是72分米,长、宽、高的比是4:3:2,这个长方体模型的体积是多少立方分米?
- 伸出你的4个手指,然后弯曲,猜一猜英语单词
- 仿写句子:春天在唱歌,泉水在唱歌,小鸟在唱歌,小朋友也在唱歌.(仿写在在,也在)
- 如图△ABC和△ECD都是等腰直角三角形,点C在AD上,AE的延长线交BD于点F,求证:AF⊥BD.
- 一项工程甲单独做a天完成,则甲的工作效率是( ).若甲做了5天,则完成的工程量是( ).
- 十分之九吨用去二分之一还剩多少
- 英语单词的现在分词go,do,wash,get,live,work,watch