英语翻译
Recent studies show that of the amount of time an average part spent in a shop,only a fraction of that time was actually spent in the machining process.Let us assume that a part spent 50 hours from the time it arrived at a plant as a rough casting or bar stock to the time it was a finished product.During this time,it would be on the machine for only 2.5 hours and e cut for only 0.75 hour.The rest of the time would be spent on waiting,moving,setting up,loading,unloading,inspecting the part,setting speeds and feeds,and changing cutting tools.
NC reduces the amount of non-chip-producing time by selecting speeds and feeds,making rapid moves between surfaces to be cut,using automatic fixtures,automatic tool changing,controlling the coolant,in-process gauging,and loading and unloading the part.These factors,plus the fact that it is no longer necessary to train machine operators,have resulted in considerable savings throughout the entire manufacturing process and caused tremendous growth in the use of NC
人气:270 ℃ 时间:2019-10-18 21:23:04
解答
手译阿,累啊Recent studies show that of the amount of time an average part spent in a shop, only a fraction of that time was actually spent in the machining process. 近期的研究表明每个部件在店内的平均...
推荐
猜你喜欢
- The more you read,the____(disturb) you'll feel it. The more you read,the____(disturb) you'll fee.
- abcd4个数的平均数是12,ab2数的平均数是9,cd的平均数是多少,
- 2次函数抛物线y=ax^2+bx+c的顶点坐标(-1,-8)且经过(0,-6)求 a b c的值
- where have you been I have been to Australian 这个句
- 汽车车轮滚动一周走过的路程是汽车轮的().
- 小学三年级数学同一根长绳测量井的深度,绳子两折时多5米,绳子3折时差3米,
- 哪个知道世界上最长的英语单词是什么啊
- 写带有'龙'字的词语