Two tames need 18 days to complete an engineering taks.Tame A have worked 3 days.Tame B have worked 4days.They have finished one fifth of the task.If team A complete the task by them selves they need ( )days.
人气:162 ℃ 时间:2019-12-01 12:57:55
解答
答案:36 (days).
假设:总任务量为1,team A的工作速度为a/天,team B的工作速度为b/天,则据题意就有:
18×(a+b)=1
3a+4b=1/5
求解上述方程得到:a=1/45;b=1/30.
当team A独自完成剩余4/5任务时,据题意就有:4/5÷1/45=36 (days).
推荐
猜你喜欢
- 故事书的本数比科技书多25%,如果科技书再多买40本就与故事书同样多.故事书有多少本?
- 已知函数f(x)的= EX-AX-1(a> 0时,e是自然对数).
- 甲乙两人的存款中,甲比乙多2/5,当甲取出4200元后,与乙的存款数比是14:25,请问乙原来存款多少钱?
- 1、有装满桶油的、装半桶油的和空桶各7个,不用称,不用倒,怎样将这些油连同桶平均分成3份?
- 英语翻译
- 英语翻译
- 适当形式填空:It's eight o'clock in the evening.The Kings( )(watch) TV.
- 24点 (4.8.2.5)、(9.1.2.2)、(3.8.2.2)、(6.4.3.10) 呵呵,帮帮忙啦!~